For the first time, leveraging domestic scientific and technological capabilities, a synchronous equipment line for a 600 MW coal-fired thermal power plant has been researched and manufactured in Vietnam.
On the afternoon of October 4, at the Ministry of Industry and Trade, the State-level Acceptance Committee evaluated and approved two scientific projects on the manufacturing of auxiliary equipment for coal-fired thermal power plants.
After 6 years of research, domestic scientists have mastered the design and manufacture of fire prevention and firefighting systems for coal-fired thermal power plants.