NATIONAL RESEARCH INSTITUTE OF MECHANICAL ENGINEERING

  • Tiếng Việt
Calculation results, design, and application of the fly ash transportation pipeline system for thermal power plants.

Calculation results, design, and application of the fly ash transportation pipeline system for thermal power plants.

Authors: Nguyen Hoang Giang, Nguyen Chi Cuong

Published in: Proceedings of the National Scientific Conference on Hydraulic Machinery and Automation Systems 2021

Publication date: 2021

Abstract: Boilers in a coal-fired thermal power plant generate thermal energy and ash by-products (including fly ash and bottom slag). Fly ash is collected by dust hoppers along the plant's flue gas path. The ash is then transported to the fly ash silo via pipelines. To ensure stable operation of the ash transport pipeline, many parameters need to be accurately evaluated. The National Research Institute of Mechanical Engineering (NARIME) has calculated, designed, and supplied the fly ash transport pipeline system (including 04 pipeline routes for 02 boilers) for the Thai Binh 1 coal-fired thermal power plant. The system has an ash transport capacity of up to 26 t/h for each pipeline route. Currently, the system operates well and is highly appreciated by the investor.

Full text: view the full text of the article at this link